Finkenweg will be closed on one or both sides in the area of house no. 15 from 28.11. to probably 06.12.2023 due to the laying of district heating pipes. Access to the construction site possible on both sides. Note: The full closure of Rißlochweg is lifted in the week from 27.11. to 03.12.2023 and can be used as a detour!


You might also be interested in